If you are a European buyer, someone will ask you for a declaration of conformity, a RoHS statement and — since December 2024 — the identity of the EU responsible person. Here is exactly what we hand over, who signs it, and where our role legally stops. No vague claims about "full CE certification".
Ruiyuze is an order-based contractor with eight staff and no factory of its own. Parts are produced in partner workshops in Jiangsu and Zhejiang. That has a direct consequence for compliance, and it is better you hear it from us than discover it in an audit.
Drawings, material declarations, process records, test results, inspection reports. We assemble the full technical documentation for the part we ship, and we keep a copy for seven years so a repeat order can be matched to the original file.
For a component or a sub-assembly, the CE mark is applied by the party that places the finished product on the EU market — usually you, not us. We supply the underlying test evidence and material statements so you can sign your own DoC with confidence. Where the part is a finished appliance or a machine supplied under our name, we sign the DoC ourselves and name the workshop that built it.
Under GPSR (EU) 2023/988, in force since 13 December 2024, a product sold into the EU needs a responsible economic operator established in the EU, named on the product or its packaging and on the online listing. A Chinese exporter cannot be that person. We will tell you plainly that you or your EU importer must be named — and we will not sell you a "EU agent certificate" that does not exist.
Why say this out loud? Because the alternative — a supplier who promises "CE certified, everything included" and then cannot name a test house or a file number — is what gets buyers into trouble at the border and in front of their own customers. Our position is narrower and it holds up.
Ask for any line item below with your enquiry and we will confirm in the quotation whether it applies to your part, who issues it, and how long it takes. Anything marked "by arrangement" has a cost and a lead time; we quote it rather than absorb it silently.
| Declaration of conformity (CE / UKCA) | Issued when the part falls under a directive we can declare for, or supplied as a draft for your own DoC when you are the party placing the product on the market. Which of the two applies is stated in the quotation, before you order. |
|---|---|
| RoHS statement | Statement on the ten restricted substances, backed by supplier declarations for each material used. Available for every cable, connector and machined part we ship. |
| REACH statement | Declaration on SVHC content above 0.1 % w/w against the current candidate list, plus the date the list was checked. We re-check on request for long-running programmes. |
| Material certificates | Mill certificates (EN 10204 3.1) for steel, stainless and aluminium where the grade matters; copper and insulation data for cable. By arrangement — usually adds 2–3 days on the first order. |
| Electrical test records | 100 % continuity and, on request, 1500 V hipot with the actual readings recorded per harness, not just a tick box. Serial-numbered so a field failure can be traced back to a batch. |
| Dimensional inspection report | First-article inspection report (FAIR) with the measured values against your drawing's critical dimensions. Standard on new parts; optional per batch afterwards. |
| Product liability insurance | We can provide a certificate of our liability cover and, where your contract requires it, name your company as an additional insured. Confirm the required limit with your enquiry — this is a contract term we need to check, not something we can promise retroactively. |
| Social & ethical audit reports | Available for the specific partner workshop producing your part, on request, under NDA. We do not hold a group-wide BSCI or Sedex certificate, because each workshop is audited separately and we will not present one site's report as if it covered another. |
| CBAM data | For steel and aluminium parts: product weight, material grade and, where our supplier provides them, actual embedded emissions. The CBAM obligation and the 50-tonne annual threshold sit with the EU importer, not with us — but we will supply the data you need to report rather than leave you estimating. |
| Packaging & labelling | Buyer-specific labels, barcodes (EAN/GS1), country of origin marking and language-specific packaging text. We do not translate legal text for you — send the approved wording and we print it exactly. |
These come up in almost every first conversation with a Nordic or German buyer. Short answers here; the long ones we will put in writing.
Ask a better question: which directive, which test house, which file number, who signed the DoC. A component does not carry a CE mark on its own — it contributes to the conformity of the assembly you build. We will give you the evidence and the honest answer for your specific part.
No. GPSR requires the responsible economic operator to be established in the EU. Any Chinese supplier offering to be yours in that role is either misunderstanding the regulation or selling you a document with no legal effect. You or your importer takes that role.
We are an eight-person engineering and trading company, not a factory, so a factory certificate would be misleading. What we do have is a documented inspection routine per order, a named engineer responsible for your file, and the approved sample kept on record as the reference for every batch.
Yes — and we will name the workshop in writing before the order. Second-party audits, video walk-throughs and third-party inspections (SGS, TÜV, Bureau Veritas, Intertek) at your cost are all workable. Tell us the audit standard up front so we can confirm the site is ready for it.
Kept short on purpose — only the deadlines that change what has to be on the paperwork.
| 13 Dec 2024 | GPSR (EU) 2023/988 applies. EU responsible person must be identifiable; online listings need safety information and traceability. Affects what your web shop has to display. |
|---|---|
| 1 Jan 2026 | CBAM definitive period starts. Steel and aluminium among the covered goods. The 50 t/year aggregate threshold applies to the EU importer, so your first reporting obligation depends on your total volume, not on this order alone. |
| 9 Dec 2026 | New Product Liability Directive transposition deadline. Moves liability toward software and digital components and, in several member states, tightens what a distributor can be held responsible for. Worth checking with your own counsel for Denmark and Finland, where the national rules differ. |
| Ongoing | REACH candidate list updates twice a year. For long-life programmes we re-check the list against your part on request rather than assuming last year's statement still holds. |
This page is written for procurement and quality teams, not as legal advice. Requirements differ by product category and member state — confirm the final scope with your own compliance adviser.
If your organisation has a supplier questionnaire, a document checklist or a quality agreement template, send it with your drawing. We will come back with exactly which items we can meet, which need a third party, and what each one adds to the lead time — in the same reply as the price.
Tell us the part and the destination country. We will tell you what documentation applies, who signs it, and where the gaps are — before you commit to an order.